pölkky suomi english Sales

- - - oulu.jpg

Impregnated timber from Oulu

Pölkky Oy's pressure impregnation facilitiy was built at Rusko in Oulu in 1991. The treatment is carried out using the latest, environmentally-friendly impregnating agents.

Oulu pressure treatment facility

  • 24-metre impregnation tunnel
  • Separate fixing channel
  • Impregnation grades A and AB conform with the SFS 3974 and En 351 standards
  • In terms of protective agents, class A represents 16 kg/m3 of wood preservative and class AB 9 kg/m3
  • Production of impregnated timber:  33,000 m3/year